Permit to Erect Temporary Building
Apply for Permit to Erect Temporary Building
Building and Construction Authority (BCA)
Application Details
A person/owner who intends to erect any temporary/makeshift structure is required to apply for a Temporary Building Permit. The application must reach BCA 3 weeks before the construction of the temporary building.